Work Programme 2022 Intermediate Report 2
Marcuzzi D.; Pavei M.; Zanotto L.; Luchetta A.; Pasqualotto R.; Serianni G.; Chitarin G.; Dal Bello S.; Lorenzini R.; Sottocornola A.; Vanzetto M.; Grando L.; Boldrin M.
pp. 1 - 51
Year:
2022
ISTP Authors: Aldo Sottocornola
Gianluigi Serianni
Luca Grando
Roberto Pasqualotto
Keywords: ITER, Neutral Beam Test Facility, NBTF, PRIMA
Research Activitie: PROJECT REPORTS
Related products
-
Fusion engineering and design (Print) 166 pp. 112265-1 - 112265-7 Year: 2021 DOI: 10.1016/j.fusengdes.2021.112265
Final design of electrostatic probes for MITICA beam line components
Spagnolo S.; Spolaore M.; Dalla Palma M.; Pasqualotto R.; Barzon A.; Brombin M.; Franchin L.; Sartori E.; Tiso A.; Visentin M.
-
Fusion engineering and design 166 pp. 112271-1 - 112271-4 Year: 2021 DOI: 10.1016/j.fusengdes.2021.112271
Investigation of corrosion-erosion phenomena in the primary cooling system of SPIDER
Cavallini C.; Dalla Palma M.; Fellin F.; Gasparrini C.; Tinti P.; Zamengo A.; Zaupa M.
-
Giornate Nazionali di Saldatura (GNS 10), pp. 1 - 20 , Genova , May 30-31, 2019 Year: 2019
Costruzione e ispezioni della camera da vuoto dell’iniettore di neutri per l’esperimento MITICA (progetto ITER)
Manfrin S.; Rossetto F.; Valente M.; Zaccaria P.; Bolcato D.; Parma A.; Ruaro D.; Zanotto M.; Micò Mantova G.; Annino C.; Moreno J.F.
English
Italiano