n the quest to reach ITER target parameters for the additional heating systems, a Neutral Beam Test Facility (NBTF) was set up at Consorzio RFX (Italy), including two experiments. MITICA is the full-scale Heating Neutral Beam (HNB) prototype, expected to enter into operation in 2025, while SPIDER, inaugurated in 2018, is aimed at testing and optimizing in advance the ion source. The first SPIDER experimental campaign was concluded at the end of 2021, and a major shutdown is ongoing to implement refurbishments and modifications, in order to restart operation towards the target parameters. The beam source was disassembled for a thorough inspection, which led to additional necessity or opportunity for improvement, beyond the already identified refurbishment, repairs or enhancements foreseen within the lessons learned after the results obtained and the events occurred during operation. A double-digit number of projects led to about 30 procurements for refurbishment of existing parts or manufacturing of new replacing ones. Further to that, two projects of outstanding relevance are driving the shutdown cost and schedule. The pumping system shall be enhanced in order to keep the pressure in the vessel low enough to avoid RF electric field induced discharges on the rear side of the source, still keeping the pressure inside at the prescribed values. Non-Evaporable Getter (NEG) pumps will be installed on a new dedicated vessel module on the source side of SPIDER experiment. RF generators substitution was decided after demonstrating the limitations caused by the original oscillators: intrinsic frequency instabilities on resonant loads and presence of high voltage inside the generator prevented the system to work efficiently and safely at the required conditions. Solid state amplifiers have been chosen for the replacement, as they have already been tested positively at IPP. This contribution presents the status of these main upgrades.
Present status of SPIDER upgrades
Marcuzzi D.; Toigo V.; Rotti C.; Singh M.; Fantz U.
Conference:
SOFE 2023 - IEEE Symposium on Fusion Engineering,
, Oxford, UK , 9-13 July 2023
Year:
2023
ISTP Authors:
Keywords: SPIDER, NBTF
Research Activitie: PROCEEDINGS PAPERS
Related products
-
3rd European Conference on Plasma Diagnostics (ECPD 2019), , Lisbon, Portugal , May 6-9, 2019 Year: 2019
High Resolution Probe for filament transport and current density study at the edge region of W7-X
Spolaore M.; Agostinetti P.; Killer C.; Cavazzana R.; Ghiraldelli R.; Grenfell G.; Grulke O.; Moresco M.; Martines E.; Neubauer O.; Nicolai D.; Satheeswaran G.; Schweer B.; Vianello N.; Visentin M.; W7-X Team
-
Workshop on Electric Fields, Turbulence and Self-Organization Magentized Plasmas (EFTSOMP 2019), , Padova, Italy , 15-16 July 2019 Year: 2019
High Resolution Probe (HRP) for Filament Transport and current density study at the edge region of W7-X
Spolaore M.; Agostinetti P.; Killer C.; Moresco M.; Brombin M.; Cavazzana R.; Ghiraldelli R.; Grenfell G.; Grulke O.; Knieps A.; Lazerson S.A.; Martines E.; Neubauer O.; Nicolai D.; Satheeswaran G.; Schweer B.; Vianello N.; Visentin M.; W7-X Team
-
20th International Conference on Enviromental Degradation of Materials in Nuclear Power Systems - Water Reactors, , Snowmass, Colorado, USA , July 17-21, 2022 Year: 2022
Investigation on Release Rates of Vacuum Tight Threaded Junction (VTTJ) Samples Exposed to Ultrapure Water
Cavallini C.; Gasparrini C.; Dalla Palma M.; Rizzieri R.; Agostinetti P.; Zaupa M.; Sonato P.;
Zin V.; Montagner F.; Miorin E.; Badocco D.; Pastore P.; Minarello A. -
2020 29th International Symposium on Discharges and Electrical Insulation in Vacuum (ISDEIV), , Padova, Italy , 26-30 September 2021 Year: 2021
Ceramic coatings for arc prevention between plasma facing components
Cordaro L.; Cavazzana R.; Zuin M.; Berton G.; Pavei M.; Spolaore M.; Peruzzo S.
English
Italiano