Framework Contract F4E-OFC-582 – Specific Contract F4E-OFC-582-02 – QR9- 10: Progress Report of the activities
Pilan N.; Sottocornola A.; Tinti P.; Manfrin S.
pp. 1 - 4
Year:
2021
ISTP Authors: Aldo Sottocornola
Keywords: neutral beam injector, PRIMA, F4E-OFC, NBI
Research Activitie: PROJECT REPORTS
Related products
-
Plasma physics and controlled fusion (Print) 63 (12), pp. 125009-1 - 125009-11 Year: 2021 DOI: 10.1088/1361-6587/ac2eb2
First results from beam emission spectroscopy in SPIDER negative ion source
Barbisan M.; Zaniol B.; Pasqualotto R.; Serianni G.; Ugoletti M.
-
Fusion engineering and design 173 pp. 112907-1 - 112907-8 Year: 2021 DOI: 10.1016/j.fusengdes.2021.112907
Application studies of the modular multilevel converter topology to the acceleration grid power supply of the DEMO neutral beam injector
Ratti D.; Ferro A.; Santoro F.; Gaio E.
-
29th International Conference Nuclear Energy for New Europe - NENE 2020, pp. 513-1 - 513-8 , Portoroz, Slovenia , September 7-10, 2020 Year: 2020
Calorimeter Design for Neutral Beam Injector of DTT – Thermo-hydraulic Analysis
Koncar B.; Ovtar D.; Costa Garrido O.; Draksler M.; Agostinetti P.
-
Fusion engineering and design 146 pp. 660 - 665 Year: 2019 DOI: 10.1016/j.fusengdes.2019.01.049
The CNESM neutron imaging diagnostic for SPIDER beam source
Croci G.; Muraro A.; Perelli Cippo E.; Grosso G.; Pasqualotto R.; Cavenago M.; Cervaro V.; Dalla Palma M.; Feng S.; Fincato M.; Franchin L.; Giacomelli L.; Murtas F.; Nocente M.; Rebai M.; Tardocchi M.; Tollin M.; Gorini G.
English
Italiano