Activities on the task PROJ_24 «Decision on electron dump»
Agostinetti P.; Pasqualotto R.; Pimazzoni A.; Serianni G.; Veronese F.
pp. 1 - 43
Year:
2022
ISTP Authors: Gianluigi Serianni
Piero Agostinetti
Roberto Pasqualotto
Keywords: NBTF, SPIDER, electron dump, ITER, Neutral Beam Test Facility
Research Activitie: PROJECT REPORTS
Related products
-
Fusion engineering and design (Print) 166 pp. 112265-1 - 112265-7 Year: 2021 DOI: 10.1016/j.fusengdes.2021.112265
Final design of electrostatic probes for MITICA beam line components
Spagnolo S.; Spolaore M.; Dalla Palma M.; Pasqualotto R.; Barzon A.; Brombin M.; Franchin L.; Sartori E.; Tiso A.; Visentin M.
-
Fusion engineering and design 164 pp. 112170-1 - 112170-5 Year: 2021 DOI: 10.1016/j.fusengdes.2020.112170
1 MV power supplies integration issues in MITICA experiment, the ITER Heating Neutral Beam Injector prototype
Boldrin M.; Valente M.; Dal Bello S.; Grando L.; Toigo V.; Zaccaria P.; Decamps H.; Tobari H.; Simon M.; Escudero G.G.; Garbuglia A.
-
Giornate Nazionali di Saldatura (GNS 10), pp. 1 - 20 , Genova , May 30-31, 2019 Year: 2019
Costruzione e ispezioni della camera da vuoto dell’iniettore di neutri per l’esperimento MITICA (progetto ITER)
Manfrin S.; Rossetto F.; Valente M.; Zaccaria P.; Bolcato D.; Parma A.; Ruaro D.; Zanotto M.; Micò Mantova G.; Annino C.; Moreno J.F.
-
Nuclear fusion 61 (7), pp. 076012-1 - 076012-14 Year: 2021 DOI: 10.1088/1741-4326/abfb13
H-mode plasmas in the pre-fusion power operation 1 phase of the ITER research plan
Loarte A.; Polevoi A.R.; Schneider M.; Pinches S.D.; Fable E.; Militello Asp E.; Baranov Y.; Casson F.; Corrigan G.; Garzotti L.; Harting D.; Knight P.; Koechl F.; Parail V.; Farina D.; Figini L.; Nordman H.; Strand P.; Sartori R.
English
Italiano