On-site Assembly, Installation, and Acceptance Test Plan of SPIDER Beam Dump
Dalla Palma M.; Brombin M.; Tollin M.; Zaupa M.
pp. 1 - 10
Year:
2019
ISTP Authors: Matteo Brombin
Mauro Dalla Palma
Keywords: SPIDER Assembly, Neutral Beam Test Facility, NBTF, SPIDER
Research Activitie: PROJECT REPORTS
Related products
-
pp. 1 - 6 Year: 2022 DOI: 10.1017/s0022377819000758
Guidelines for the installation of the FBG sensors for MITICA BLCs using epoxy
Poggi C.; Ciufo S.; Dalla Palma M.; Ravarotto D.; Pasqualotto R.
-
29th International Conference Nuclear Energy for New Europe - NENE 2020, pp. 513-1 - 513-8 , Portoroz, Slovenia , September 7-10, 2020 Year: 2020
Calorimeter Design for Neutral Beam Injector of DTT – Thermo-hydraulic Analysis
Koncar B.; Ovtar D.; Costa Garrido O.; Draksler M.; Agostinetti P.
English
Italiano