Procedure for HVDC tests of MITICA Post insulators
Pilan N.; Zaccaria P.
pp. 1 - 6
Year:
2022
ISTP Authors:
Keywords: MITICA, F4E-OFC, HVDC, MITICA Beam Source, Neutral Beam Test Facility, NBTF
Research Activitie: PROJECT REPORTS
Related products
-
FuseNet PhD Event 2022, , 2022 , 4-6 July, 2022 Year: 2022
Introduction to the ITER Neutral Beam Test Facility
Serianni G.
-
29th International Conference Nuclear Energy for New Europe - NENE 2020, pp. 513-1 - 513-8 , Portoroz, Slovenia , September 7-10, 2020 Year: 2020
Calorimeter Design for Neutral Beam Injector of DTT – Thermo-hydraulic Analysis
Koncar B.; Ovtar D.; Costa Garrido O.; Draksler M.; Agostinetti P.
English
Italiano